Greenhouse solution 2 MWe
In the summer of 2019, 2 projects were realised in Limburg, in which 2 new installations were installed together with the integrated Dordtech exhaust gas cleaner. Here, in cooperation with Siemens, the first high-efficiency engines were installed for a horticultural solution with an electrical output of 2 MWe.
The first results show an efficiency that is significantly higher than that of the engines replaced in this project. It is already certain that the savings on gas consumption more than justify these growers' investment.
Also unique to this installation is the link between the engine control system and the emission control system of Dordtech's own exhaust gas cleaner. The interaction of these systems provides even better efficiency and tuning, and also results in extremely good emission values, which are needed for the type of crop these growers cultivate.
The complete project was developed, supplied, built and commissioned by Dordtech, and Dordtech Maintenance provides 24/7 remote monitoring and service of the complete systems and the exhaust gas cleaning. This combination of services has not been seen before in the Dutch market.
- Project location
- Baarlo/Kessel
- Project type
- Greenhouse horticulture 2 MW
- Information
- Questions or interest? Please do not hesitate to contact us





